The implication for electric grid operators is they must be prepared for the largest generator to fail at all times. To avoid disruptions, backup generators, or ‘spinning reserves’ are required by the North American Electric Reliability Council (NERC) to run around the clock. If any generator on the grid fails, spinning reserves are ready to kick in almost instantaneously.
In order to ramp up and offer extra capacity when needed, spinning reserve generators do not operate at optimal levels. Much like idling a car, the extra capacity “uses fuel while producing no power. Thus, reserve capacity is zero percent-efficient,” according to Princeton University’s Ted Borer in a May 2015 column in Microgrid Knowledge.
Considering spinning reserves run all the time, the financial and environmental costs are substantial.
In this example, the largest generator is a 600 MW Central Power Plant which requires another 600 MW of spinning reserves ready to cover for it.
Largest Power Plant, Spinning Reserves, No Distributed Microgrids
- One 600 MW Central Power Plant
- One 600 MW Backup Power Plant (Spinning Reserves)
Redundant Capacity: 600 MW
Since spinning reserve capacity is equal to the largest power plant (at minimum), then limiting the size of the largest power plant reduces the need for spinning reserves.
Distributed Microgrids reduce the need for central generation and transmission infrastructure. In this example, distributed microgrids reduce the size of the largest generator from 600 MW to 200 MW. The spinning reserve capacity decreases respectively.
- One 200 MW Central Power Plant
- One 200 MW Backup Power Plant (Spinning Reserves)
- Four 50 MW Distributed Microgrids
Redundant Capacity: 200 MW
These are overly simplified models. Notably, there must be enough distributed generation to replace all 600 MW central power plants with 200 MW plants.
The concept can be taken a step further, to a future electric grid made up entirely of distributed generation. In such a grid, the need for spinning reserves is limited to the size of the largest microgrid.
- No Central Power Plant
- One 50 MW Backup Generator
- Six 50 MW Microgrids
Redundant Capacity: 50 MW
Like the cost of transmission, the cost of maintaining spinning reserves is not considered when grid operators and energy markets choose generators.
The cost is passed to all customers, so distributed generators are not currently compensated for the value to decrease spinning reserves.
It is an example of how a well thought out system of distributed energy resources can decrease waste and inefficiency. When power is generated near population centers, the waste heat can also be used.